HSB Launches New IoT Solution for Schools

Hartford Steam Boiler, part of Munich Re, announced a new customized IoT solution for schools to protect buildings and equipment against water leaks, freezing pipes, mold and perishable goods spoilage.

HSB Connected Technologies will monitor buildings and equipment 24/7 and alert school officials immediately of any potential risks. School officials will be able to check on conditions in gyms, locker rooms, offices and other spaces on campus with the use of a mobile app.

“We think of schools as bustling with students, teachers and activity,” said Jack Volinski, HSB senior vice president in a press release.  “But what about when the school is empty?  Perhaps at night, on a holiday weekend, or winter and summer breaks?  Our IoT solution monitors property and equipment risks and sends an alert to proactively mitigate damages that traditional building management systems cannot prevent.”

HSB’s new school solution is powered by advanced algorithms that consider multiple risk factors. The IoT sensors use the latest LoRaWAN® network protocols to provide long range and strong signal strength across school buildings.

The IoT solution is available through school risk pools and property-casualty insurance companies that partner with HSB.

Learn more at hsbconnectedtechnologies.com

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

  • Amazon Expands Lockers to More Than 500 College, University Campuses

    Amazon recently announced that its Locker Network now totals more than 750 locations at more than 500 college and university campuses around the United States, according to a company news release.