HSB Launches New IoT Solution for Schools

Hartford Steam Boiler, part of Munich Re, announced a new customized IoT solution for schools to protect buildings and equipment against water leaks, freezing pipes, mold and perishable goods spoilage.

HSB Connected Technologies will monitor buildings and equipment 24/7 and alert school officials immediately of any potential risks. School officials will be able to check on conditions in gyms, locker rooms, offices and other spaces on campus with the use of a mobile app.

“We think of schools as bustling with students, teachers and activity,” said Jack Volinski, HSB senior vice president in a press release.  “But what about when the school is empty?  Perhaps at night, on a holiday weekend, or winter and summer breaks?  Our IoT solution monitors property and equipment risks and sends an alert to proactively mitigate damages that traditional building management systems cannot prevent.”

HSB’s new school solution is powered by advanced algorithms that consider multiple risk factors. The IoT sensors use the latest LoRaWAN® network protocols to provide long range and strong signal strength across school buildings.

The IoT solution is available through school risk pools and property-casualty insurance companies that partner with HSB.

Learn more at hsbconnectedtechnologies.com

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • University of Kentucky Reopens Scovell Hall

    The University of Kentucky recently reopened Scovell Hall, part of the Martin-Gatton College of Agriculture, Food and Environment (CAFE), following comprehensive renovations to the 120-year-old facility in Lexington, Ky., according to a news release.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.