Kenyon College Building New Library

GAMBIER, OH – September 10 marked an occasion to celebrate in the construction of the new library at Kenyon College, designed by GUND Partnership. The entire campus community and design and construction teams were invited to sign a structural steel beam painted Kenyon’s signature purple. The beam signing was followed with a ceremony to mark the topping off of the library. Kenyon President Sean Decatur officiated the ceremony and unveiled the building’s new name, a name that is borrowed from the past: Chalmers Library. After the name was announced, spectators watched as Smoot Construction hoisted the purple beam to the top of the new library. Construction will be complete by the end of 2020, with an opening planned for spring 2021.

Kenyon College Library 500

Chalmers Library replaces Kenyon’s existing Olin and Chalmers libraries, which were not optimized for 21st-century learning and were at their physical limits. The new library is expecting LEED Gold certification and presents one of the largest opportunities to reduce Kenyon’s carbon footprint through signification energy savings. The new highly flexible state-of-the-art library will support active and collaborative learning and will feature a variety of environments to encourage student growth, curiosity, and exploration. Academic Advising, Career Development, the Registrar, and Student Accessibility Services will move to the library as an integrated hub connecting work inside the classroom with work outside of it.

The original Chalmers Memorial Library opened in 1962 and was named for Gordon Keith Chalmers, Kenyon’s 13th president, who served from 1937 until his death in 1956. The new Chalmers library will also recognize his wife, Roberta Teale Swartz Chalmers H’60, a poet, teacher, and co-founder of the Kenyon Review.

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.