Kenyon College Building New Library

GAMBIER, OH – September 10 marked an occasion to celebrate in the construction of the new library at Kenyon College, designed by GUND Partnership. The entire campus community and design and construction teams were invited to sign a structural steel beam painted Kenyon’s signature purple. The beam signing was followed with a ceremony to mark the topping off of the library. Kenyon President Sean Decatur officiated the ceremony and unveiled the building’s new name, a name that is borrowed from the past: Chalmers Library. After the name was announced, spectators watched as Smoot Construction hoisted the purple beam to the top of the new library. Construction will be complete by the end of 2020, with an opening planned for spring 2021.

Kenyon College Library 500

Chalmers Library replaces Kenyon’s existing Olin and Chalmers libraries, which were not optimized for 21st-century learning and were at their physical limits. The new library is expecting LEED Gold certification and presents one of the largest opportunities to reduce Kenyon’s carbon footprint through signification energy savings. The new highly flexible state-of-the-art library will support active and collaborative learning and will feature a variety of environments to encourage student growth, curiosity, and exploration. Academic Advising, Career Development, the Registrar, and Student Accessibility Services will move to the library as an integrated hub connecting work inside the classroom with work outside of it.

The original Chalmers Memorial Library opened in 1962 and was named for Gordon Keith Chalmers, Kenyon’s 13th president, who served from 1937 until his death in 1956. The new Chalmers library will also recognize his wife, Roberta Teale Swartz Chalmers H’60, a poet, teacher, and co-founder of the Kenyon Review.

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.