Rockwell Integrated Sciences Center at Lafayette College Celebrates Grand Opening

PHILADELPHIA, PA – The grand opening of the Rockwell Integrated Sciences Center (RISC) on the campus of Lafayette College in Easton, PA, took place in late September. The five-story, 104,000-square-foot academic science and laboratory building features a basement, laboratories, a vivarium, greenhouse, classrooms, and administrative spaces for the Biology, Neuroscience, and Computer Science departments.

The building brings together Lafayette’s biology, computer science, environmental science, and neuroscience departments to promote the integration of different sciences and to foster collaboration and innovation. In addition to academic departments, the building houses the Dyer IDEAL Center for Innovation and Entrepreneurship, the Hanson Center for Inclusive STEM Education and will also connect to the Acopian Engineering Center building.

Lafayette College Integrated Science Center 500

The Harman Group provided structural engineering services for the $75-million project, the largest capital project in the school’s history. Turner Construction Company is the builder and Boston-based architecture firm, Payette, designed the building to encourage collaborative learning amongst the college’s science and engineering departments.

Situated on the north side of the campus’ quad, adjacent to the Anderson Courtyard, RISC is set into a hillside in between two existing buildings, requiring a unique structural configuration of the five-story building. The building terraces down the steep slope with the main entrance from Anderson Courtyard into the third floor with two floors below and three floors visible from the courtyard. The foundation system employs spread and mat footings, underpinning of the existing buildings, and replacement of an aging 15-foot-tall retaining wall on the slope. The structure is a concrete slab on metal deck and composite beam floor system with a steel superstructure. A steel vierendeel truss system provides open column-free space, connecting the lobby to the exterior lower courtyard, supporting the brick exterior wall on the south side. The building was also strategically designed with vibration control to allow the operation of sensitive research equipment in the lab spaces.

Featured

  • Philadelphia Middle School Facility Earns LEED Gold Certification

    The Alternative Middle Years (AMY) at James Martin Middle School in Philadelphia, Penn., recently received a LEED Gold certification from the U.S. Green Building Council, according to a news release. The School District of Pennsylvania partnered with KSS Architects on the project.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.

  • Fargo, N.D., Starts Construction on Consolidated Elementary School

    Fargo Public Schools in Fargo, N.D., recently announced the beginning of construction on a new elementary school, according to a news release. The district partnered with ICON Architectural Group and Kraus-Anderson Construction on the new Horace Mann Elementary School.

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.