New Construction for Growing Mountain View Student Population

Mountain View High School and Los Altos High School celebrated the start of construction of new classroom buildings with a groundbreaking ceremony. The new construction, funded by a $295-million bond measure passed last year, will accommodate the California district’s rapidly growing student population. The buildings were designed by Quattrocchi Kwok Architects (QKA) and will be built by RGM Kramer Inc.

Mountain View High School

MVHS will add two new buildings totaling in 42,000 square-feet of new construction. The new two-story main classroom building will feature:

  • Four life-skills labs for Special Education students;
  • Expandable classrooms with movable walls;
  • Writable wall surfaces;
  • Small group break-out rooms; and a
  • Staff collaboration lounge.

A new single-story building will be for STEM classrooms including: two computer science classrooms, an engineering lab with 3D printing capabilities, a robotics lab and an electronics prototyping lab.

Los Altos High School

LAHS will gain a new auxiliary gymnasium and 23 new classrooms.

The general classroom building will include: a culinary arts classroom, several flexible learning spaces and a teacher collaboration room. A new lab building will include spaces for 3D printing, laser cutting, and an advanced computer lab.

Both campuses will pursue LEED-Silver certification and are designed to meet Collaborative for High Performance Schools (CHPS) standards.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • University of Mary Washington Selects Builder for New Theater, Dance Facility

    The University of Mary Washington in Fredericksburg, Va., recently announced that it has selected construction and development firm Skanska to lead a series of renovations and upgrades to fine arts facilities, according to a news release.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.

  • Missouri Child Development Center Completes $2.3M Expansion

    The Urban Sprouts Child Development Center in St. Louis, Mo., recently announced the completion of a $2.3-million expansion and adaptive reuse project, according to a news release. The new space includes a retail café, outdoor learning space, and a support office building.