Reach for the Stars: Designing a STEM Elementary

The two-story, 109,500-square-foot facility offers a variety of spaces that make student engagement, collaboration and flexibility top priorities

De Soto ISD’s Katherine Johnson Technology Magnet Academy aims to spark curiosity at an early age through STEM education. Named after Katherine Johnson, one of the first African-American mathematicians employed by NASA and the focus of the 2016 film “Hidden Figures,” KJTMA offers learning opportunities in robotics, coding, science, digital art, and music production for 900 elementary students. Perkins and Will designed this innovative K-5 educational facility that features collaborative and flexible learning spaces and encourages student engagement.

At the heart of the school is the two-story media center, designed to blur the lines between indoor and outdoor space.

“The design solution centered around the school’s programming, which included early exposure to STEM education as a priority — this is unique to the district, as it is typically abnormal to encounter any kind of STEM education until students approach high school,” Matt Davis, project manager, said. “This strategy set KTJMA up for success, because parents knew exactly what the elementary school was about — the goals for the facility and the educational program were upfront and clear. The emphasis on outdoor learning spaces and STEM programs was about more than just increasing the capacity of the school; it was about making an investment in the students and their future.”

Perkins and Will designed this innovative K-5 educational facility that features collaborative and flexible learning spaces and ecourages student engagement.

The two-story, 109,500-square-foot facility offers project-based, collaborative learning and outdoor learning spaces. At the heart of the school is the two-story media center, designed to blur the lines between indoor and outdoor space. The media center is surrounded by outdoor learning spaces, allowing natural light to stream in. Flexible collaboration zones connect classroom corridors with the media center and outdoor spaces.

Flexible collaboration zones connect classroom corridors with the media center and outdoor spaces.

“All the classrooms surround the specialty spaces, placing them adjacent to these outdoor learning labs, creating transparency and flexibility between them,” Project Designer Jennifer Lane explains. “For example, the main courtyard can fit the entire student body, while there are two additional courtyards that are paired with specialty programs — the art courtyard and the robotics courtyard.”

The two-story, 109,500-square-foot facility offers project-based, collaborative learning and outdoor learning spaces.

Several interactive elements were incorporated into the building to encourage student engagement. A binary code pattern alluding to robotics and coding principles was added to the exterior building fenestration. Interactive wall graphics illustrate a space-travel themed journey that connects the content to the adjacent spaces; others display information about Katherine Johnson’s historic contributions and various STEM topics. Bright, colorful niches in the media center allow students to play within the walls. Colorful floor designs inspired by circuit boards and connections helps students find their way through the building. QR codes embedded in the wall graphics lead to supplementary information on the topic that can be accessed by students using their school-issued iPads, while teachers can edit content tied to the codes at any time.

Bright, colorful niches in the media center allow students to play within the walls.

As school curriculum constantly changes to accommodate evolving STEM-related career fields, the most important aspect to keep in mind when designing a STEM-focused school is the flexibility of spaces, the Perkins and Will design team notes.

“The idea here was that versatility empowers students to behave differently, so that they don't have to ask for permission to collaborate or share their learning experiences with each other,” Senior Interior Project Architect Catherine Dalton said. “The transparency and accessibility are what inspires students to lead their own education and become critical thinkers.” 


About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

Digital Edition