Construction Completed on El Capitan High School’s Events Center

Construction has been completed on the new $10.7 million, 15,000-square-foot event center for Grossmont Union High School District’s El Capitan High School in Lakeside, California. C.W. Driver Companies constructed the facility and HED served as the architect.  

Consisting of two buildings on the campus’ south side, the new event center houses band, drama, and dance spaces and features 250 retractable seats to accommodate theater productions, performances, and events. It also includes a lobby, concession and snack bar, storage space, AV room, and green room.

“It was a pleasure to partner with El Capitan High School to create a multifunctional events center that serves as a new focal point for the campus,” said Hank Withaar, vice president at C.W. Driver Companies. “We leveraged our extensive K-12 experience to build a facility that will serve students well and benefit the school’s performing arts programs for years to come.”

The new center’s design references the school’s outdoor surroundings including the lines and angles of the region’s mountains and horizons, and incorporated the region’s iconic sycamore trees into the landscaping.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • University of Kentucky Reopens Scovell Hall

    The University of Kentucky recently reopened Scovell Hall, part of the Martin-Gatton College of Agriculture, Food and Environment (CAFE), following comprehensive renovations to the 120-year-old facility in Lexington, Ky., according to a news release.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.