Francis Tuttle Technology Center Completed in Oklahoma City

OKLAHOMA CITY, OK – Francis Tuttle Technology Center, one of the premier career training schools in the state of Oklahoma, has recently seen the completion of the Francis Tuttle Industrial Technology Building on its Reno campus.

 As outlying communities continue to grow, the demand for access to affordable education and training follows. Francis Tuttle’s desire to continue their reach and expand class offerings resulted in a new building on their existing Reno campus. Designed by Bockus Payne, an interdisciplinary architecture and design firm, the 27,325-square-foot academic building consists of one story dedicated to core classes and student support areas that articulate a proud industrial presence while providing innovative solutions necessary to inform 21st-century students.

Francis Tuttle Industrial Technology Building

Image courtesy of Bockus Payne

The Bockus Payne team designed a facility that not only supports the needs of the diverse student population but that is also reflective of Francis Tuttle’s expanded trade offerings. It was important to reference the types of classes offered within the design intent — Advanced Manufacturing, Welding and Construction Trades. The building itself is identifiable with industrial technology but connects with existing themes from the original Francis Tuttle look. The introduction of Corten steel at entry will continue to patina over time, a nod to the welding module. At night, the name glows through cut outs within the steel structure, providing an added layer of detail and identity. The building is built off-axis to address views of the existing Reno building and provide a more dramatic appearance. Landscaping was carefully selected to complement — it’s simplistic and Oklahoma centered.

Indoors, students are greeted by a reception and spacious lounge area which also doubles as a safe room / shelter. Linear lighting runs throughout, providing added interest and a playful edge to the industrious building. Three large bays fill the remainder of the space; each with windows to view trades from the main public corridor. The interiors of each are neutral and durable, reflective of the school’s past, but contrast with bold pops of striking color that fill the ceilings to assist with wayfinding. Each bay contains a formal classroom, office, stair to mezzanine as well as expansive square footage dedicated to high-tech equipment for hands-on learning. The building design embodies the goals identified by the owner and supports the trades taught to develop a thriving incoming workforce.

Featured

  • Greenheck Debuts New Energy Recovery Ventilator

    Greenheck recently released a new energy recovery ventilator, the ERVi, designed for small indoor spaces like basements and mechanical rooms, according to a news release. The hardware can fit through a 30-inch door and be mounted on the ceiling for retrofit and decarbonization projects.

  • Pfluger Architects Announces Promotions of Seven Staff Members

    Texas-based architecture firm Pfluger Architects recently announced that it has promoted seven staff members to senior-level positions. One of the promotions is that of Dallas-based Senior Project Architect Chad Martin to Principal, according to a news release.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.