East Central Community College Opens Football Operations Center

DECATUR, MS – East Central Community College recently officially opened its new Warrior Hall football operations center the campus in Decatur, MS. The $2.6-million, 12,300-square-foot facility is located just outside the north end zone of Warrior Field at Bailey Stadium.

Warrior Hall at East Central Community College

Warrior Hall contains locker rooms for players and for coaches, a team meeting room, position conference rooms, coaches’ offices, an equipment room, a players’ lounge and a laundry room. It also houses a state-of-the-art training room with hydrotherapy pool to be used by student-athletes in all nine varsity sports at the college.

Offices, conference rooms, meeting rooms, the Hall of Champions, the locker room and individual lockers, the equipment room, the training room, the hydrotherapy pool, the coaches’ locker room and the main team meeting room and the chairs in that room were among the items in Warrior Hall sponsored by donors.

The architect for Warrior Hall was Eley Guild Hardy Architects of Biloxi. The contractor was J&J Contractors Inc. of Collinsville.

Featured

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.