UCSD Forges Ahead on Two "Neighborhood" Projects

While the University of California San Diego has put some projects on hold due to financial constraints introduced by the pandemic, the university is forging ahead with construction work on its North Torrey Pines Living and Learning Neighborhood and planning for its Future College Living and Learning Neighborhood.

Rendering of North Torrey Pines

The first, the North Torrey Pines site, is a 10-acre "neighborhood" that will become the new home of the university's Sixth College and two new academic buildings, one for the Division of Social Sciences and another for the Division of Arts and Humanities. That campus will have 995,000 square feet of classrooms, recreation, lecture halls and dining facilities along with new housing for 2,000 undergraduates. A craft center will have a public-use gallery space and community-led classes and events. An auditorium will seat 600 in a concert-caliber structure.

The student housing will be ready for fall 2020, with the academic programs space completed by the end of the year.

The project is pursuing Platinum LEED certification. The contractor is Clark Construction. A February 2020 drone flyover video of the project is available on YouTube.

Rendering of Future College

The second neighborhood, Future College, is also designed to accommodate residential life for 2,000 undergraduate students as well as academic space for a new undergraduate college. According to the university, the project will also improve the university's theatre district with meeting space, retail, dining, underground parking for 1,200 cars and a significant amount of open space and outdoor gathering areas, some with ocean views.

The project is pending UC Regent approval, with the goal of opening in the fall of 2023 as the university's eighth college.

That campus would feature five buildings ranging in height from nine to 21 stories with about 900,000 gross square feet. The contractor is Kitchell. If approved, construction was expected to begin in fall 2020 with completion in fall 2023.

The university will pursue Gold LEED certification for Future College. Sustainability measures include the use of natural ventilation, drought-resident landscaping, high-efficiency features, high-performance HVAC, low-power density lighting, an anaerobic digester system for treating sewage and a photovoltaic array for solar power production.

The projects are intended to keep pace with institutional enrollment, which was 30,000 for the 2018-2019 academic year but was expected to grow to about 42,000 in five years, according to reporting by the San Diego Union-Tribune. That story quoted Chancellor Pradeep Khosla as saying that although the number of students living in dorms this fall could drop by 2,000 due to changes driven by the coronavirus, he expected the downturn to be temporary.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • school building with glowing circuit board patterns

    AI Is Coming to Schools — But Most School Buildings Still Run on Institutional Memory

    As school districts race to introduce AI into classrooms, administration, and curriculum planning, another conversation is happening behind the scenes: How prepared are school facilities themselves for the operational demands AI will create?

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.