UCSD Forges Ahead on Two "Neighborhood" Projects

While the University of California San Diego has put some projects on hold due to financial constraints introduced by the pandemic, the university is forging ahead with construction work on its North Torrey Pines Living and Learning Neighborhood and planning for its Future College Living and Learning Neighborhood.

Rendering of North Torrey Pines

The first, the North Torrey Pines site, is a 10-acre "neighborhood" that will become the new home of the university's Sixth College and two new academic buildings, one for the Division of Social Sciences and another for the Division of Arts and Humanities. That campus will have 995,000 square feet of classrooms, recreation, lecture halls and dining facilities along with new housing for 2,000 undergraduates. A craft center will have a public-use gallery space and community-led classes and events. An auditorium will seat 600 in a concert-caliber structure.

The student housing will be ready for fall 2020, with the academic programs space completed by the end of the year.

The project is pursuing Platinum LEED certification. The contractor is Clark Construction. A February 2020 drone flyover video of the project is available on YouTube.

Rendering of Future College

The second neighborhood, Future College, is also designed to accommodate residential life for 2,000 undergraduate students as well as academic space for a new undergraduate college. According to the university, the project will also improve the university's theatre district with meeting space, retail, dining, underground parking for 1,200 cars and a significant amount of open space and outdoor gathering areas, some with ocean views.

The project is pending UC Regent approval, with the goal of opening in the fall of 2023 as the university's eighth college.

That campus would feature five buildings ranging in height from nine to 21 stories with about 900,000 gross square feet. The contractor is Kitchell. If approved, construction was expected to begin in fall 2020 with completion in fall 2023.

The university will pursue Gold LEED certification for Future College. Sustainability measures include the use of natural ventilation, drought-resident landscaping, high-efficiency features, high-performance HVAC, low-power density lighting, an anaerobic digester system for treating sewage and a photovoltaic array for solar power production.

The projects are intended to keep pace with institutional enrollment, which was 30,000 for the 2018-2019 academic year but was expected to grow to about 42,000 in five years, according to reporting by the San Diego Union-Tribune. That story quoted Chancellor Pradeep Khosla as saying that although the number of students living in dorms this fall could drop by 2,000 due to changes driven by the coronavirus, he expected the downturn to be temporary.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.