Five Tips for Creating a Vibrant, Modern Learning Space

When we merged two elementary schools to form the new West Rowan Elementary School building last year, we knew we had our work cut out for us. Fortunately, both schools already embraced alternative classroom seating arrangements. With that buy-in on our side, we replaced the traditional “one-size-fits-all” classroom seating approach with one that allowed students to pick a place to sit, lounge on a comfortable plush couch, or even lie on the floor.

Classroom with flexible furniture at West Rowan Elementary School.

Knowing that kids perform best when they’re comfortable, we hired MiEN Company to help us bring our vision to reality. Here are five strategies we used to make it happen:

1. Form a teacher-centric planning committee. We mobilized a team of teachers to serve on a “furniture committee.” The committee then met with the school system representatives and was ultimately part of the decision to work with MiEN as our furniture partner.

2. Find a reliable, experienced vendor. The company gave us some preliminary ideas and let us look at a variety of different furniture options. They listened and took notes as we were thinking out loud, and then came back with great ideas that fit our vision. Using those ideas, our committee came back with a variety of different seating, table, and desk arrangements that teachers were able to choose from.

3. Give teachers a few great choices to select from. We knew that making teachers choose from dozens of furniture styles and colors would be completely overwhelming, so we narrowed it down to a couple of options for K-2 and a couple more for grades 3-5. Teachers picked from Room A or Room B designs, but were also able to customize their rooms according to their own preferences.

4. Promote collaboration during the selection process. Much like our classrooms are now highly collaborative, engaging environments, the furniture selection process was equally as collaborative from the teacher/committee perspective. It was exciting to see instructors team up to create innovative learning spaces that would come together to create one cohesive campus experience.

5. Help teachers through the paradigm shift. Change isn’t always easy to manage and some of our teachers were initially uncomfortable with their new classroom setups. They just couldn’t get past the fact that you really don’t need a specific chair for every child. It was a paradigm shift for some of them. To help, we talked to teachers about the value of having a more modular, flexible classroom, and encouraged them to weave that into their instructional planning. We wanted to ensure that we put students first in all that we do.

Throughout the entire building process, we continually reassured teachers and encouraged them to think about their teaching as they were planning out their spaces. We wanted them to make decisions in the best interest of their students, knowing that the “one-size-fits-all” classroom furniture model just doesn’t work in the modern learning environment. 

About the Author

Kristine Wolfe is Principal at West Rowan Elementary School in Cleveland, N.C.

Featured

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.