Construction Nears Completion on Drone Lab at St. Mary's University in TX

St. Mary’s University in San Antonio, TX is nearing completion of new drone lab, which is on target to be done in October. The $600,000 Unmanned Aerial Systems (UAS) Lab is being built by the School of Science, Engineering and Technology.

<p>3D rendering of the Unmanned Aerial Systems Laboratory. Source: <a href="https://www.stmarytx.edu/">St. Mary's University</a></p>

The 1,734-square foot lab has a 25-foot ceiling and includes a flight area, an observation area and workstations. The expectation is that faculty will be able to include drones in their instruction and students will be able to participate in drone-related research for industry partners.

"This is an opportunity to add programming that will launch St. Mary’s graduates into a fast-growing emergent industry," said Winston Erevelles, dean of the School, in a press release. Erevelles said that the Federal Aviation Administration predicted that the U.S. registered commercial drone fleet would climb to between 442,000 and 1.6 million units in the next few years, "which will in turn create a few hundred thousand jobs."

According to Erevelles, the facility will serve as a multi-purpose operation, supporting a new UAS concentration under the B.S. in Engineering Science program that launched this fall and housing summer camps for high school students.

"Drone technology has been around for more than 50 years. However, it was exclusively used by the military and was not available to the private sector until recently," added Bahman Rezaie, a professor of electrical engineering, who has been an early proponent of drone research at the university. "The more drones become part of everyday business in all aspects of life, the more need for a workforce that is knowledgeable and capable of maintaining and designing a variety of drones."

Funding came from a $3 million Title V – Building Capacity for Excellence in STEM Education grant as well as support from the Albert & Margaret Alkek Foundation and the Union Pacific Foundation.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.