3M Announces New Floor Care System

3M’s Commercial Solutions Division launched a new line of products that reduces the labor and product costs associated with routine floor maintenance, according to the company. The 3M™ Advanced Floor Care System allows “users to achieve a striking, high-gloss floor appearance,” while reducing or eliminating the need for burnishing.

“Facility management teams are busier than ever ensuring their facilities are clean and safe for all who enter,” Patrick Kehoe, US & Canada Marketing Manager for 3M Chemicals, Floor Protectors, and Floor Safety products said in a press release. “That’s why we have designed a floor care system that fits seamlessly into their maintenance routine and achieves a beautiful result while also reducing maintenance costs over time.”  

The system includes the 3M™ Clean & Shine Daily Floor Enhancer, the Scotch-Brite™ Clean & Shine Pads, and the Scotchgard™ Protect & Shine Floor Protector.

The Daily Floor Enhancer maintains the gloss of floors and works on both coated and uncoated floors. The Clean & Shine Pads increases the shine of the floor, removes black marks three times faster than traditional cleaning pads, and lasts longer than traditional cleaning pads. The Protect & Shine Floor Protector provides abrasion and soil resistance and reduces maintenance needs by requiring less chemical stripping.

For more information about the products, visit www.3m.com/floorcare.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.