3M Announces New Floor Care System

3M’s Commercial Solutions Division launched a new line of products that reduces the labor and product costs associated with routine floor maintenance, according to the company. The 3M™ Advanced Floor Care System allows “users to achieve a striking, high-gloss floor appearance,” while reducing or eliminating the need for burnishing.

“Facility management teams are busier than ever ensuring their facilities are clean and safe for all who enter,” Patrick Kehoe, US & Canada Marketing Manager for 3M Chemicals, Floor Protectors, and Floor Safety products said in a press release. “That’s why we have designed a floor care system that fits seamlessly into their maintenance routine and achieves a beautiful result while also reducing maintenance costs over time.”  

The system includes the 3M™ Clean & Shine Daily Floor Enhancer, the Scotch-Brite™ Clean & Shine Pads, and the Scotchgard™ Protect & Shine Floor Protector.

The Daily Floor Enhancer maintains the gloss of floors and works on both coated and uncoated floors. The Clean & Shine Pads increases the shine of the floor, removes black marks three times faster than traditional cleaning pads, and lasts longer than traditional cleaning pads. The Protect & Shine Floor Protector provides abrasion and soil resistance and reduces maintenance needs by requiring less chemical stripping.

For more information about the products, visit www.3m.com/floorcare.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.