Virginia Commonwealth Shows Off New Engineering Research Building — Virtually

Virginia Commonwealth Shows Off New Engineering Research Building — Virtually

Virginia Commonwealth University's College of Engineering is celebrating the opening of its new Engineering Research Building this week — virtually.

According to the university, the 133,000-square-foot building is intended to support advanced research and economic development initiatives with a design that emphasizes makerspaces, collaborative research facilities and flexible gathering areas. Maker resources will include 3D printing, bench electrical fabrication, tabletop equipment and hand tools, industrial-scale manual and CNC mills and lathes.

Virginia Commonwealth Shows Off New Engineering Research Building — Virtually

Situated in in close proximity to both one of the institution's engineering buildings and its School of Business, the new structure significantly expands the college's laboratory capacity.

Virginia Commonwealth Shows Off New Engineering Research Building — Virtually

Among the features of the new facility are:

  • Interdisciplinary research laboratories;

  • Experiential learning facilities;

  • Meeting and gathering spaces;

  • Informal meeting and study areas;

  • A career services center;

  • Wired outdoor work and gathering spaces; and

  • The "Ram Bytes" café.

University and elected officials were expected to participate in a ribbon cutting broadcast and tour over Zoom on Feb. 3, 2021.

Virginia Commonwealth Shows Off New Engineering Research Building — Virtually

Planning was initially done in 2015. The design was done by Richmond-based architecture firm Baskervill and Boston-based firm Goody Clancy.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.