UW-Platteville to Build 2.4MW Solar Array

The University of Wisconsin-Platteville has received approval from the state to erect a 2.4-megawatt solar array on its campus. According to the university, this will be the largest solar array owned by a Wisconsin state agency and will make the campus the sixth-highest on-site producer of renewable energy in the country among institutions of higher education.

According to a university article on the project, the array will feed directly into the main electricity meter connected to the 32 campus buildings, generating all electricity in real-time, rather than sending it back to the grid. The solar is expected to offset electricity by 17%, saving an annual $217,000 and reducing carbon emissions by 2,300 tons per year. The campus also hosts a wind turbine and a smaller rooftop solar project on its Engineering Hall.

University of Wisconsin-Platteville Solar Array
The existing solar array on the rooftop of Engineering Hall at the University of Wisconsin-Platteville
Source: University of Wisconsin-Platteville

The project was instigated when some 300 students at the school signed a petition in 2018, asking the administration to achieve 100% renewable energy for the campus by 2030. In the following year, 82% of students agreed with the goal in a referendum. The array is one of several projects now being advanced by the university to achieve carbon neutrality.

A chain-link fence will surround the array, which will be installed with pilings. The array is expected to have a 30-year life and is designed to accommodate future battery storage.

The array work is also providing students with opportunities for hands-on learning. Faculty are incorporating related projects into their coursework. Students in a sustainable and renewable energy systems course helped design the initial project. Dairy science students formed a plan for sheep grazing under the array. And reclamation, environment and conservation students developed a native pollinator seeding plan for the space.

"We are excited to take this momentous step in our commitment to sustainability," said Chancellor Dennis Shields in a statement. "These efforts will save taxpayer money and have a lasting impact on future generations of Pioneers."

The array is scheduled to be operational by fall 2021.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • Texas A&M Adds ALPR Technology to Parking Solutions

    Texas A&M University in College Station, Texas, recently integrated automatic license plate recognition (ALPR) technology into its parking services and enforcement strategies, according to a news release. The university’s Transportation Services division deployed Genetec AutoVu ALPR to manage the campus’ 36,000+ parking spaces.

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • Illinois Elementary School Breaks Ground on Campus Expansion

    Heather Hill Elementary School, part of Flossmoor School District 161 in Palatine, Ill., recently broke ground on a new addition to the school focused on student support and security, according to a news release. The district partnered with Wold Architects & Engineers for the expansion as part of a longer-term facility planning and modernization initiative.

Digital Edition