Georgia Schools Add Ionization Devices to HVAC Systems

The Bibb County School District in Macon, Ga., announced in a press release that it will be adding needlepoint bi-polar ionization devices to the HVAC systems in each of its schools.

Designed to clean the air of normal impurities like dirt, mold, and dust, these devices have also been proven to remove 99.9% of infections pathogens—including SARS-CoV-2, the virus that causes COVID-19. They had already been added to several schools in the district as part of normal renovations and upgrades, including Appling Middle School, John R. Lewis Elementary, and Hartley Elementary. The district expressed a goal to have all of its schools outfitted with the ionization devices by the end of February.

School district communications specialist Jeremy Timmerman calls them an extra layer of protection. “We have masks in place, we have social distancing in place, we have policies for quarantining both faculty, staff, and students for the case of someone contracting the virus or being in contact with the virus,” he said. “This is just another way that we can keep students safe when they come back to the classroom.”

According to a video released by the school district on Twitter, the device ties straight into a school’s HVAC unit and is mounted on the side. It positively charges the air passing through it to create a plasma field. The positive ions that it emits cause the virus to “try to clump together to survive,” robbing the virus of the hydrogen atoms that it needs to stay alive. “Obviously, the more ions you put in the air, the better the system is,” said Sam Kitchens, executive director of Capital Programs, in the video.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • Big Horn Academy

    Big Horn Academy

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Big Horn Academy has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.