Tutt Construction to Upgrade Wyoming High School's Bleachers

At its meeting in early March, the Sheridan County School District 2 in Sheridan, Wyo., awarded a bid for new bleachers to Tutt Construction Inc. of Billings, Mont. The total bid for the project, including delivery and installation of the new bleachers at Sheridan High School, was $147,000.

According to Assistant Superintendent Scott Stults, the new bleachers will replace the portable ones currently residing on the west and east sides of the high-school gymnasium. Unlike the existing ones, the new bleachers will be motorized, allowing one or two people to be able to move them as necessary instead of a larger group.

Stults also said that the new bleachers will be much more secure and much safer than the ones currently in use.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • How Proactive Maintenance Can Transform Athletic Facilities into Strategic Assets for College Sports

    College athletics is entering one of the most transformative periods in its history. With NIL reshaping financial models and competitive expectations, athletic departments across the country are being asked to do more than ever with increasingly constrained resources.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.