NC State Enters Phase 4 of Greek Housing Project

North Carolina State University is partnering with KWK Architects and Jenkins-Peer Architects for Phase 4 of its five-phase Greek Village Master Plan. Infrastructure work is in progress for a new apartment building and two new townhouse units.

The apartment building will stand four stories, cover 62,900 square feet, and have room for 147 beds in separate bedrooms. The unit’s main apartment design will be a four-bedroom, two-bathroom apartment with a living room and kitchen.

Design work is also underway for two townhouse units of three stories each. Townhouse A will cover 22,786 square feet and have room for a total of 75 beds, a commercial kitchen, and a shared dining room. Townhouse B will measure in at about 17,136 square feet and contain a total of 57 beds.

Demolition of current structures on the property—two Greek chapter houses, a duplex, and university entomology labs—is scheduled to be finished by June. Construction will begin after that and is expected to be completed by fall 2023.

The NC State Greek Village Master Plan was originally designed in 2006, then redefined in 2014, then redefined again in 2020. The goal of the plan, divided up into five phases, is to convert an outdated housing area into a state-of-the-art neighborhood on campus.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Indiana University Launches Capital Campus in D.C.

    Indiana University recently held a ribbon-cutting ceremony for the new IU Capital Campus in Washington, D.C., according to university news. The eight-story facility will provide a central hub for the university’s existing programs and business operations based in D.C., uniting them under one roof and providing the opportunity to expand.