NC State Enters Phase 4 of Greek Housing Project

North Carolina State University is partnering with KWK Architects and Jenkins-Peer Architects for Phase 4 of its five-phase Greek Village Master Plan. Infrastructure work is in progress for a new apartment building and two new townhouse units.

The apartment building will stand four stories, cover 62,900 square feet, and have room for 147 beds in separate bedrooms. The unit’s main apartment design will be a four-bedroom, two-bathroom apartment with a living room and kitchen.

Design work is also underway for two townhouse units of three stories each. Townhouse A will cover 22,786 square feet and have room for a total of 75 beds, a commercial kitchen, and a shared dining room. Townhouse B will measure in at about 17,136 square feet and contain a total of 57 beds.

Demolition of current structures on the property—two Greek chapter houses, a duplex, and university entomology labs—is scheduled to be finished by June. Construction will begin after that and is expected to be completed by fall 2023.

The NC State Greek Village Master Plan was originally designed in 2006, then redefined in 2014, then redefined again in 2020. The goal of the plan, divided up into five phases, is to convert an outdated housing area into a state-of-the-art neighborhood on campus.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Homewood-Flossmoor High School NetZero Addition

    Homewood-Flossmoor High School NetZero Addition

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Homewood-Flossmoor High School NetZero Addition has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • UNH Marks Construction Milestone on Oceanic Exploration Facility

    The University of New Hampshire in Durham, N.H., recently celebrated a major construction milestone with a beam-signing ceremony for the new Center of Excellence for Operational Ocean and Great Lakes Mapping, according to a news release. The facility’s ultimate goal is to support research, training and technical assistance in ocean mapping.