San Jacinto College Goes Solar

San Jacinto College, located in the metroplex area of Houston, Texas, has announced plans to add solar electricity arrays to two of its buildings. The arrays, designed and installed by Sunfinity Renewable Energy, are set to lower the school’s utility costs by millions and contribute to better air quality in the area.

“Solar generation is just one part of the college’s commitment to improving our energy efficiency,” said Dr. Brenda Hellyer, San Jacinto College Chancellor. “We have always been a trusted steward of the community’s resources. These solar arrays are simply a visible reminder of that ongoing commitment.”

One of the arrays, a 391 kW solar system with 990 solar panels, will go into the Central Campus’ Anderson-Ball Classroom Building, slated to open in Jan. 2022. The building measures in at 122,000 square feet, and is notable for using foundations from previous campus buildings and as the largest educational building in the country made of mass timber.

The other array, a 263 kW system with 667 solar modules, will go into the Jones Building on South Campus. The Jones Building is currently seeing a $13M renovation project that started late last year and is scheduled to finish by fall 2021. Part of the renovations include updating the classrooms for peak period use.

“Sunfinity has helped a wide range of businesses reap the benefits of solar energy,” said Sunfinity Chairman and CEO John Billingsley. “That includes nonprofit and for-profit organizations, but bottom line – it’s about the bottom line. A ‘commercial’ solar system can return hundreds of thousands of dollars—even millions—that can go toward other priorities. We think San Jacinto College has made a wise decision in going solar, and we appreciate their confidence in us.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Kent State Academic Building Earns LEED Silver Certification

    Kent State University in Kent, Ohio, recently announced that its newest academic building, Crawford Hall, has earned a LEED Silver certification from the U.S. Green Building Council, according to a news release. The facility was recognized for its innovative design, water conservation technologies, energy-efficient systems, and sustainable construction materials, among other features.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition