San Diego Unified School District Breaks Ground on Two Modernization Projects

The San Diego Unified School District has officially begun modernization projects on two of its schools: La Jolla Elementary School and John Muir Language Academy. California builders C.W. Driver Companies broke ground on both construction projects last week. Work on both schools will entail renovations of existing buildings as well as the construction of new ones. The architects of record for the project are domusstudio architecture for La Jolla and the Baker Nowicki Design Studio for John Muir.

The work at La Jolla Elementary School (K-5) is scheduled to include upgrading existing permanent buildings and constructing a new two-story classroom and administrative building, a new kindergarten classroom building, a new lunch facility, and a restroom building for the school’s upper athletic field. Modernization of the existing structures includes infrastructure and technology updates, a maker space, outdoor learning areas, and a larger parking lot. An existing kitchen will also be remodeled, and the existing campus administration building will house more classrooms.

John Muir Language Academy Rendering
Photo Credit: domusstudio architecture

At the John Muir Language Academy (K-8), workers will add a new two-story PE locker room and classroom building and a new administration building, as well as expansions of the kindergarten and kitchen facilities. All existing permanent buildings will also be updated.

“C.W. Driver Companies is proud to partner with San Diego Unified School District on the continued updating of its schools throughout the county,” said Keith Kauffman, Project Executive with C.W. Driver Companies. “We will leverage our extensive experience in building education facilities to deliver an engaging, collaborative environment while minimizing the impact of construction on students, faculty and staff.”

The construction at the John Muir Language Academy is expected to last until 2023, while work at La Jolla Elementary School is slated for completion in 2024.

“As the second-largest district in California serving more than 121,000 students in preschool through Grade 12, providing optimized learning environments for our students is a top priority,” said the Chief Facilities Planning and Construction Officer with the San Diego Unified School District, Lee Dulgeroff. “We are confident that C.W. Driver Companies’ modernizations of La Jolla Elementary and John Muir Language Academy will enhance the educational experience and prepare our students for the future.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • KnowBe4 Releases Report on Education Sector’s Preparedness for Cyberattacks

    Cybersecurity platform KnowBe4 recently released a new research report titled “From Primary Schools to Universities, The Global Education Sector is Unprepared for Escalating Cyber Attacks,” according to a news release.

  • K–12 Safety Trends Report Reveals Reliance on Training, Technology

    Wearable safety technology provider CENTEGIX recently released its 2025 School Safety Trends Report, according to a news release. The report is based on more than 265,000 incidents during the 2024–25 school year as reported through the CENTEGIX Safety Platform, used by more than 800 school districts across the U.S.

  • Boosting Student Wellness and Safety Through Indoor-Outdoor School Spaces

    Engaging students through facilities designed for indoor and outdoor learning and activities reflects a growing awareness of how children learn and thrive, with educators recognizing the importance of getting outside and disconnecting from technology. And, as today’s youth grapple with the urgent mental health crisis of increased anxiety and loneliness fueled by both the pandemic and technology, along with a related crisis in youth physical health, the wellness benefits of getting outside have never been so palpable.

  • UT-Austin Breaks Ground on 17-Story Business School

    The University of Texas at Austin recently broke ground on a new, 17-story facility that will serve as the new home for the school’s McCombs School of Business, according to university news. The groundbreaking ceremony took place on April 10 for Mulva Hall, which will include amenities like classrooms, academic department suites, research centers, faculty offices, the dean’s office, and gathering spaces.

Digital Edition