Texas High School Completes Campus Expansion Project

Lake Highlands High School, located in Richardson, Texas, announced this week that it has completed a campus expansion and renovation project. The work was done by Cadence McShane Construction and includes updates to multiple school facilities.

In a press release, Cadence McShane Construction listed the work that has been finished, including:

  • A 144,000-square-foot addition connecting the freshman center with the rest of the high school, including an expanded cafeteria, kitchen, common space and library.
  • A multipurpose activity center with a 78,000-square-foot practice facility (including an 80-yard practice field) and a 24,000-square-foot addition for offices, locker rooms, and support areas.
  • New general classrooms, science classrooms, ART Labs, and SPED classrooms repurposed from the former cafeteria and library spaces.
  • A two-story ICF storm shelter that also acts as a weight room, wrestling room, and locker room.

The project, designed by HKS, found its funding from a bond approved by voters in 2016. That bond allowed for $107 million in capacity, construction and renovation projects across the entire Richardson Independent School District (RISD) and $114 million in sports-related improvements, additions, and enhancements.

“Having the opportunity to renovate Lake Highlands High School and be able to give them the facilities that thye need to grow was exciting,” said Will Hodges, Cadence McShane Construction president. “We are proud to have had the opportunity to foster our relationship further with RISD and HKS on this project.”

Cadence McShane and RISD have partnered on 19 separate projects in the last 20 years.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition