Texas High School Completes Campus Expansion Project

Lake Highlands High School, located in Richardson, Texas, announced this week that it has completed a campus expansion and renovation project. The work was done by Cadence McShane Construction and includes updates to multiple school facilities.

In a press release, Cadence McShane Construction listed the work that has been finished, including:

  • A 144,000-square-foot addition connecting the freshman center with the rest of the high school, including an expanded cafeteria, kitchen, common space and library.
  • A multipurpose activity center with a 78,000-square-foot practice facility (including an 80-yard practice field) and a 24,000-square-foot addition for offices, locker rooms, and support areas.
  • New general classrooms, science classrooms, ART Labs, and SPED classrooms repurposed from the former cafeteria and library spaces.
  • A two-story ICF storm shelter that also acts as a weight room, wrestling room, and locker room.

The project, designed by HKS, found its funding from a bond approved by voters in 2016. That bond allowed for $107 million in capacity, construction and renovation projects across the entire Richardson Independent School District (RISD) and $114 million in sports-related improvements, additions, and enhancements.

“Having the opportunity to renovate Lake Highlands High School and be able to give them the facilities that thye need to grow was exciting,” said Will Hodges, Cadence McShane Construction president. “We are proud to have had the opportunity to foster our relationship further with RISD and HKS on this project.”

Cadence McShane and RISD have partnered on 19 separate projects in the last 20 years.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Indiana Wesleyan University Schedules Grand Opening for New Welcome Center

    Indiana Wesleyan University recently announced that it will soon open a new Welcome Center on its campus in Marion, Ind., according to a news release. The facility will serve as the home base for prospective students and their families to learn more about the university and student life there. A ribbon-cutting ceremony is scheduled for February 19.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.