Energy Harness Releases Ceiling-Mounted UV-C Light Fixture

LED manufacturing and distribution solutions provider Energy Harness recently released a new product to help schools combat COVID-19. The Active Airflow UV-C fixture is a “germicidal” light fixture that sucks in air and treats it with ultraviolet light, providing an enclosed space with continuous disinfection from the virus as well as other airborne bacteria and germs.

The enclosed device can be installed in ceiling grids to treat indoor areas of up to 256 square feet. It can connect to the ceiling’s existing power grid used to power light fixtures. Multiple units can be installed in larger rooms to offer the same treatment. The unit does not produce visible light.

Energy Harness Active Airflow

Nationally recognized testing lab Intertek Laboratories found that the Active Airflow UV-C has a 99.9% effectiveness rate in eliminating pathogens from the air. Testing on the SARS-CoV-2 virus revealed that the device has a 99.998% inactivation rate for that virus in particular within a single second.

“We have demonstrated and studies have shown the effectiveness of UV-C light in killing the COVID-2 family of pathogens,” said the managing director of Energy Harness’ Midwest division, Patricio M. Daneri. “Our Active Airflow unit provides the added advantage of safe usage during the school day in occupied classrooms. The unit has a fan system to draw in the air, where it is cleaned and then cycled back into the room.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • PNSI Global Alliance Launches New Quality Assurance Certification

    PNSI Global Alliance, a network of technology integrators and service providers, recently introduced a new Quality Assurance Certification (QAC) for AV service and support, according to a press release. The two-day, interactive workshop QAC course is designed for Certified Solution Providers (CSPs) to provide them with the most up-to-date and advanced quality assurance knowledge available.

Digital Edition