Energy Harness Releases Ceiling-Mounted UV-C Light Fixture

LED manufacturing and distribution solutions provider Energy Harness recently released a new product to help schools combat COVID-19. The Active Airflow UV-C fixture is a “germicidal” light fixture that sucks in air and treats it with ultraviolet light, providing an enclosed space with continuous disinfection from the virus as well as other airborne bacteria and germs.

The enclosed device can be installed in ceiling grids to treat indoor areas of up to 256 square feet. It can connect to the ceiling’s existing power grid used to power light fixtures. Multiple units can be installed in larger rooms to offer the same treatment. The unit does not produce visible light.

Energy Harness Active Airflow

Nationally recognized testing lab Intertek Laboratories found that the Active Airflow UV-C has a 99.9% effectiveness rate in eliminating pathogens from the air. Testing on the SARS-CoV-2 virus revealed that the device has a 99.998% inactivation rate for that virus in particular within a single second.

“We have demonstrated and studies have shown the effectiveness of UV-C light in killing the COVID-2 family of pathogens,” said the managing director of Energy Harness’ Midwest division, Patricio M. Daneri. “Our Active Airflow unit provides the added advantage of safe usage during the school day in occupied classrooms. The unit has a fan system to draw in the air, where it is cleaned and then cycled back into the room.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.

  • Minnesota High School Completes $226M Addition, Renovation Project

    White Bear Lake Area High School – North Campus in White Bear Lake, Minn., recently announced the completion of a $226-million renovation and addition project, according to a news release. The district partnered with Kraus-Anderson for the project’s construction, which involved creating a single high-school site for the White Bear Lake Area School District.

  • Education Design Showcase

    Spaces4Learning Launches 2025 Education Design Showcase

    Spaces4Learning is now accepting submissions for the 2025 Education Design Showcase! Launched in 1999, the program celebrates innovative and practical solutions in planning, design, and construction.

  • diverse, simplified human figures in various colors seated around a curved table, with floating icons like light bulbs and speech bubbles above them

    Spaces4Learning Relaunches Advisory Board, Announces 12 Members

    Spaces4Learning is pleased to announce the relaunch of its advisory board and the introduction of its 12 distinguished members.