Voltek Featured on “The Build Show” Video Series

Low voltage power solutions company Voltek Systems Inc. was featured in a recent episode of the popular home remodeling YouTube series "The Build Show." Host Matt Risinger, a contractor who specializes in architect-driven and fine craftmanship work, discussed the installation of low-voltage wired and powered USB outlets that can power devices like smartphones and laptops without the use of a bulky charging brick. The outlets provide input ports for both USB-A and USB-C cables.

A centrally mounted Voltek Rack Mount Power Supply unit converts 110-volt power into DC, which is distributed up to 1,000 feet through a low voltage cable to each outlet. One unit can provide power for up to 12 USB outlets installed throughout a facility. Outlets wired to the central rack mount can be placed anywhere in a building for easy charging capabilities without excess equipment. The rack-mounted power supply unit can also be attached to a battery backup to run for hours in the event of a power outage.

Wall-mounted USB outlets have grown in popularity in spaces like huddle areas, classrooms, study rooms, residence halls, and offices, as they offer the ability to charge a device conveniently and discreetly.

Voltek’s primary focus has been on the K–12 and Higher Education spaces, where laptops have become the norm for the teaching environment.  Nearly every model of laptop now charges over a USB-C connection, and the Voltek system provides the ability to charge these without the need for the AC-to-DC conversion brick. Voltek also aims to keep the laptop charging while the device is in use, as opposed to the student having to dock it on a charge cart and remove it from the learning environment during the interim.

Installation of Voltek outlets doesn’t require a licensed electrician, and they can easily be deployed as a retrofit in learning environments lacking electrical outlets. Additionally, they offer a significant cost savings over traditional 110 AC outlets when installed in a new construction project. Providing only low voltage power at the outlet, they are also safer due to no risk of electrical shock.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

Digital Edition