Pennsylvania High School to Undergo $17.4M Traffic Flow Upgrade

Hampton High School, located near Pittsburgh, Pa., will see a major redesign of its parking lots and surrounding access roads later this year. The goal of the construction project is to improve and streamline the flow of traffic for the safety of students, faculty, and the surrounding community.

The renovations have been in the works for several years, according to Superintendent Michael Loughead. Specific tasks include reconfiguring the school’s parking areas, adding a second entrance off of nearby Topnick Drive, two building additions, and upgrades to lighting and landscaping. The total cost of the project is estimated at $17.4 million.

“The bus, car and pedestrian traffic will be separated, and student dropoff will occur at a safe location,” said Chris Brown, senior architect with VEBH Architects. “Vehicle circulation will be clearer than the current arrangement, and the areas of failing paving and sidewalks will be replaced.”

The project is slated to take about 18 months and will be done in phases to minimize disruptions to campus proceedings. Construction on the building addition, which will house an upgraded media center, will begin by the end of the summer. Another new facility includes a 2,400-square-foot storage garage measuring 40 by 60 feet that will house lawn and maintenance equipment.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • Mesa West Capital Provides Loan to Refinance University of Georgia Residence Complex

    Mesa West Capital recently announced that it has provided a $133.9-million, short-term, first mortgage loan to developer LV Collective (“LV”) to refinance a student housing complex near the University of Georgia, according to a news release. Rambler Athens, a 750-bed residence hall adjacent to the campus, was completed in August 2024.

  • ECM Technologies Wins ‘Most Innovative Business of the Year’ Award

    HVAC preventative maintenance and efficiency solutions provider ECM Technologies was recently named the “Most Innovative Business of the Year” at the 2025 Champions of Change Awards, according to a news release. The program recognizes Arizona business leaders and organizations taking steps to make a positive impact on the state through innovative thinking and philanthropy.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

Digital Edition