Pennsylvania High School to Undergo $17.4M Traffic Flow Upgrade

Hampton High School, located near Pittsburgh, Pa., will see a major redesign of its parking lots and surrounding access roads later this year. The goal of the construction project is to improve and streamline the flow of traffic for the safety of students, faculty, and the surrounding community.

The renovations have been in the works for several years, according to Superintendent Michael Loughead. Specific tasks include reconfiguring the school’s parking areas, adding a second entrance off of nearby Topnick Drive, two building additions, and upgrades to lighting and landscaping. The total cost of the project is estimated at $17.4 million.

“The bus, car and pedestrian traffic will be separated, and student dropoff will occur at a safe location,” said Chris Brown, senior architect with VEBH Architects. “Vehicle circulation will be clearer than the current arrangement, and the areas of failing paving and sidewalks will be replaced.”

The project is slated to take about 18 months and will be done in phases to minimize disruptions to campus proceedings. Construction on the building addition, which will house an upgraded media center, will begin by the end of the summer. Another new facility includes a 2,400-square-foot storage garage measuring 40 by 60 feet that will house lawn and maintenance equipment.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Auburn University Debuts $224M STEM + Agricultural Sciences Complex

    Auburn University in Auburn, Ala., recently opened its new $224-million STEM + Agricultural Sciences Complex, the largest research construction project in the university’s history, according to university news. The facility measures more than 265,000 square feet and brings six departments from the College of Agriculture and College of Sciences and Mathematics together under one roof.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • Carnegie Mellon University Receives $3B Gift to Launch New Campus

    Carnegie Mellon University in Pittsburgh, Penn., recently announced that it has received $3 billion—the largest individual gift in higher education history—from Citadel CEO and founder Ken Griffin, according to a news release.