Texas High School Debuts Arts Program Expansion

Melissa High School in Melissa, Texas, recently completed a 65,000-square-foot expansion in conjunction with the Perkins&Will Dallas studio. The new space includes a new practice gymnasium, an extension of the student union, a new performance theater, and an addition to the fine arts program.

Perkins&Will Melissa High School

The fine arts program addition includes a new entryway, lobby, 1,000-seat auditorium, and other amenities like rehearsal spaces, a percussion hall outfitted with live recording capabilities, and a scene shop. One goal of the project was to highlight the district’s commitment to and passion for the arts.

Perkins&Will Melissa High School

A design narrative explains how Perkins&Will worked with the school’s existing architecture, tying together old and new. A “garden zone” of native plants complements the school’s natural landscape with the main lobby entrance, as well as serving as a gathering place for event overflow. The fine arts wing was designed to be as flexible as possible regarding spacing, lighting, acoustics, and more.

Perkins&Will Melissa High School
Photos courtesy of Charles Davis Smith

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition