Golden West College Starts Construction on Language Arts Complex

Construction on a new language arts complex recently began at Golden West College in Huntington Beach, Calif. The college is partnering with Sundt Construction, Inc., on the facility.

“We are excited to continue working on the Golden West campus,” said John Messick, Sundt’s Project Director for the California District Building Group. “Building infrastructure to support remote, in-person or hybrid learning is critical to the success of today’s students.”

The new complex will measure in at 72,251 square feet and stand three stories tall, featuring classrooms and a large reading, writing and resource center. The facility will house lecture spaces for the college’s world languages, ASL, English and speech programs. Other amenities will include gathering, office and support spaces; natural daylighting fixtures; modern LED fixtures; HVAC improvements; and native landscaping.

Project architect HMC designed the complex as two wings connected by a second- and third-floor internal bridge. “Guided by the principle of ‘connection,’ we designed the building to not only connect with the campus aesthetic, but also to provide opportunities for students to connect with campus touchpoints and classmates,” said HMC Design Principal Brett Leavitt.

The HMC Architects’ website also notes that design strategies like natural daylighting and native landscaping give the complex a head start on becoming a Zero Net Energy Building.

The first step of the construction process was the demolition of the long-standing humanities building and health sciences facility. Construction is scheduled for completion by the end of 2021.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Kimball International Releases Curated Design Support Program

    Commercial furnishings company Kimball International recently announced the launch of a new end-to-end design support program, DesignSuite. According to a news release, its goal is to guide architecture & design professionals and dealer partners through the process from vision to specification.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).