Golden West College Starts Construction on Language Arts Complex

Construction on a new language arts complex recently began at Golden West College in Huntington Beach, Calif. The college is partnering with Sundt Construction, Inc., on the facility.

“We are excited to continue working on the Golden West campus,” said John Messick, Sundt’s Project Director for the California District Building Group. “Building infrastructure to support remote, in-person or hybrid learning is critical to the success of today’s students.”

The new complex will measure in at 72,251 square feet and stand three stories tall, featuring classrooms and a large reading, writing and resource center. The facility will house lecture spaces for the college’s world languages, ASL, English and speech programs. Other amenities will include gathering, office and support spaces; natural daylighting fixtures; modern LED fixtures; HVAC improvements; and native landscaping.

Project architect HMC designed the complex as two wings connected by a second- and third-floor internal bridge. “Guided by the principle of ‘connection,’ we designed the building to not only connect with the campus aesthetic, but also to provide opportunities for students to connect with campus touchpoints and classmates,” said HMC Design Principal Brett Leavitt.

The HMC Architects’ website also notes that design strategies like natural daylighting and native landscaping give the complex a head start on becoming a Zero Net Energy Building.

The first step of the construction process was the demolition of the long-standing humanities building and health sciences facility. Construction is scheduled for completion by the end of 2021.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • University of Rochester to Break Ground on New Student Life Center

    The University of Rochester in Rochester, N.Y., recently began construction on a new Student Life building, according to a news release. The first floor will contain campus-wide gathering, program, and rehearsal space; the second floor will play home to the Greenbaum Center for Jewish Life.

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.

  • Amazon Expands Lockers to More Than 500 College, University Campuses

    Amazon recently announced that its Locker Network now totals more than 750 locations at more than 500 college and university campuses around the United States, according to a company news release.