Restroom Partition Redesign Increases Privacy

Commercial washrooms solutions company Bradley Corp. recently announced the redesign of its Mills Phenolic No-Site Partitions to eliminate gaps between doors and pilasters, offering increased privacy in all types of educational facilities. The design is now standard for the company’s full portfolio of Phenolic models in an attempt to increase the safety and comfort of the restroom experience.

The manufacturer has added a vertical phenolic partition line with a rabbeted edge along both the hinge and latch sides of the door, closing off sight lines between the interior and exterior of the restroom stall. The product is available in 12 colors and four different mounting styles. The phenolic core material has been GREENGUARD certified as low-emitting, and it stands up against high use, moisture, oil, bacteria, and graffiti. Select models are also available with extra-large panels.

“Bradley’s research shows that almost half of Americans are uncomfortable or bothered by the small gap between doors and pilasters in restroom partitions,” said Mary Scherer, product manager for Bradley Corp. “Our new Phenolic No-Site redesign eliminates unsightly gaps and gives owners and architects the options to create comfortable and discreet spaces for restroom users. We’re excited to deliver full privacy partition solutions for our customers as standard.”

The partitions come with pre-drilled indicator latch holes, as well as pre-installed threaded inserts on pilasters and doors, for easy installation.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • Minnesota District Starts Construction on Early Childhood Learning Center

    Sauk Rapids-Rice Public Schools in Sauk Rapids, Minn., recently announced that construction has begun on a new early childhood learning center and a new outdoor activities complex, according to a news release.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Texas District Breaks Ground on Second High School

    The Waller Independent School District in Waller, Texas, recently held a groundbreaking ceremony for what will become its second high school, according to a news release.