University of Arizona Breaks Ground on $85M Research Facility

The University of Arizona in Tucson, Ariz., recently broke ground on a new Applied Research Building. The three-story, 89,000-square-foot facility will bring together eight departments from four colleges (the College of Engineering, the College of Science, the James C. Wyant College of Optical Sciences and the College of Medicine-Tucson) for a cost of $85 million. The building is expected to open to students by spring 2023.

Amenities within the facility will include a thermal vacuum chamber to simulate space environmental conditions, an anechoic chamber to absorb reflections and electromagnetic waves to test antennas, a high bay lab for high-altitude balloons, and a dynamic testing lab for large objects. The building will not include classroom space, but undergraduate and graduate students are welcome to use the building for research purposes.

“The co-location of multiple, interrelated research programs will create a hub that enables new opportunities for the Fourth Industrial Revolution research that will help the university to recruit and retain recognized faculty, as well as increase federal and industry funding,” said University of Arizona President Robert C. Robbins. “The ARB will focus on expanding several areas of research that have resulted in the university being ranked among the top 100 research institutions in the world.”

The facility will provide space for research projects like nanosatellites that lessen the cost of going to space; the UA Imaging Technology Laboratory, featuring advanced sensors for astronomy research, satellite images, and chemical analysis; 3D printing facilities for aerospace parts; and stratospheric balloons for use on earth and, potentially, other planets.

“From the College of Engineering’s perspective, the timing of this building is ideal,” said David Hahn, dean of the College of Engineering. “As we compete with other top universities for talent, like faculty talent and student talent, it’s this type of facility that will allow us to improve those efforts and, in fact, beat out other universities for the very best students and the very best faculty.”

The university is partnering with the McCarthy Building Companies and SmithGroup construction firms for design and construction. The project will also entail realigning the nearby Highland Underpass.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Barbara Vick Western Branch

    Barbara Vick Western Branch

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Barbara Vick Western Branch has been recognized with an EDS 2026 Grand Prize award in the category of Renovation.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.