Pa. University Breaks Ground on New STEM Building

The University of Pittsburgh at Bradford (Pitt-Bradford), located in Bradford, Pa., recently broke ground on a new, 39,000-square-foot STEM building. According to a news release, the Engineering & Information Technologies Center will be the campus’ first new academic building in 20 years. The project comes with an estimated cost of $17.69 million, and construction is projected to be complete in late 2022.

“This is a really exciting development for Pitt-Bradford,” said Rick Esch, the campus’ interim president. “It is the first academic building that the campus has built in two decades, and it’s going to provide a state-of-the-art home for our computer information systems and technology program, energy science and technology students, and two new engineering technology programs.”

The facility will play home to the university’s Mechanical Engineering Technology, Energy Engineering Technology, Energy Science & Technology, and Computer Information Systems & Technology programs. Amenities include academic support space as well as engineering labs and shops, computer labs, the campus data center, large group classrooms, and administrative offices for faculty & staff. It will also give students access to technology like rapid prototyping machines, oscilloscopes and engineering lab stations with the goal of providing opportunities for hands-on learning.

The facility was designed by national architecture and engineering firm HED, who partnered with LGA Partners as the architect of record, interior designer and construction administrator. Rycon Construction Inc. served as the general contractor.

“Collaborative teamwork can transcend limitations,” said HED principal Chris Vogelheim, AIA. “The close collaboration between the owner and the design team enabled the creation of a building that will transform the campus. This is a signature building with a big mission to positively impact the region’s economic development through creating an inspirational place for engineering on this campus.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition