Columbine High School Debuts Renovations

Columbine High School, located in Littleton, Colo., held a ribbon-cutting ceremony recently for a series of renovations to the campus, including a new entrance. A new outdoor awning provides more privacy than the previous entrance. The campus improvements come just two years after serious consideration was given to the facility’s demolition.

“The school is a model and symbol of resiliency,” said Columbine High School Principal Scott Christy. “It’s a model of what happens when people come together in the face of tragedy and become stronger as a result.” This addition, I think, just shows the strength of this community and this school.”

According to the school’s website, improvements include:

  • Exterior improvements including fresh paint and repairs
  • A new Auxiliary Gym featuring a dance studio
  • Remodels to the interior, including updated weight rooms and locker rooms
  • A new science lab, English classroom, Family and Consumer Science classroom, and a kitchen lab
  • Exterior and interior security improvements
  • Landscaping and athletic field improvements, including new turf and an all-weather track
  • Interior improvements including painting; updating wall coverings; replacing flooring, old furniture, sinks, cabinets and shelves; and replacing ceilings
  • Infrastructure updates including wiring, HVAC, plumbing and pipes, and replacing interior lights with LEDs

According to local news, the high school’s last major renovation was in 1995. The improvements were funded through a district-wide bond.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Lawrence Group Announces Three New Hires

    Integrated planning and design firm Lawrence Group, based in St. Louis, Mo., recently welcomed three new staff members, according to a news release.

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • How Proactive Maintenance Can Transform Athletic Facilities into Strategic Assets for College Sports

    College athletics is entering one of the most transformative periods in its history. With NIL reshaping financial models and competitive expectations, athletic departments across the country are being asked to do more than ever with increasingly constrained resources.

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.