Columbine High School Debuts Renovations

Columbine High School, located in Littleton, Colo., held a ribbon-cutting ceremony recently for a series of renovations to the campus, including a new entrance. A new outdoor awning provides more privacy than the previous entrance. The campus improvements come just two years after serious consideration was given to the facility’s demolition.

“The school is a model and symbol of resiliency,” said Columbine High School Principal Scott Christy. “It’s a model of what happens when people come together in the face of tragedy and become stronger as a result.” This addition, I think, just shows the strength of this community and this school.”

According to the school’s website, improvements include:

  • Exterior improvements including fresh paint and repairs
  • A new Auxiliary Gym featuring a dance studio
  • Remodels to the interior, including updated weight rooms and locker rooms
  • A new science lab, English classroom, Family and Consumer Science classroom, and a kitchen lab
  • Exterior and interior security improvements
  • Landscaping and athletic field improvements, including new turf and an all-weather track
  • Interior improvements including painting; updating wall coverings; replacing flooring, old furniture, sinks, cabinets and shelves; and replacing ceilings
  • Infrastructure updates including wiring, HVAC, plumbing and pipes, and replacing interior lights with LEDs

According to local news, the high school’s last major renovation was in 1995. The improvements were funded through a district-wide bond.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.