Georgia District Breaks Ground on $118M K–12 Facility

A groundbreaking ceremony was held on Thursday, Sept. 30, for a new K–12 Multi-Campus facility for Savannah-Chatham County Public Schools in Garden City, Ga. The facility comes with an estimated price tag of $118 million and will cover almost 400,000 square feet. The facility will consolidate students from three local schools—Gould Elementary School, Mercer Middle School and Groves High School—underneath one roof, and it is scheduled to open in August 2023. The school is being built on the former site of Groves High School.

The campus will include amenities like a digital media lab; CTAE labs for aviation and logistics as well as business and family consumer sciences; a football stadium; a track-and-field area; soccer fields and tennis courts; a baseball field and softball field; two indoor gyms; and a 750-seat, two-story auditorium featuring a full-size performance stage. The campus will feature three paved parking lots with a capacity for 660 cars. Construction also includes the installation of a new traffic signal and the campus’ entrance for more controlled traffic flow.

The facility will have a capacity for 2,400 students. It is being funded through Education Special Purpose Local Sales Tax III dollars. The district is partnering with Charles Perry Partners, Inc., for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.