Georgia District Breaks Ground on $118M K–12 Facility

A groundbreaking ceremony was held on Thursday, Sept. 30, for a new K–12 Multi-Campus facility for Savannah-Chatham County Public Schools in Garden City, Ga. The facility comes with an estimated price tag of $118 million and will cover almost 400,000 square feet. The facility will consolidate students from three local schools—Gould Elementary School, Mercer Middle School and Groves High School—underneath one roof, and it is scheduled to open in August 2023. The school is being built on the former site of Groves High School.

The campus will include amenities like a digital media lab; CTAE labs for aviation and logistics as well as business and family consumer sciences; a football stadium; a track-and-field area; soccer fields and tennis courts; a baseball field and softball field; two indoor gyms; and a 750-seat, two-story auditorium featuring a full-size performance stage. The campus will feature three paved parking lots with a capacity for 660 cars. Construction also includes the installation of a new traffic signal and the campus’ entrance for more controlled traffic flow.

The facility will have a capacity for 2,400 students. It is being funded through Education Special Purpose Local Sales Tax III dollars. The district is partnering with Charles Perry Partners, Inc., for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.