Georgia District Breaks Ground on $118M K–12 Facility

A groundbreaking ceremony was held on Thursday, Sept. 30, for a new K–12 Multi-Campus facility for Savannah-Chatham County Public Schools in Garden City, Ga. The facility comes with an estimated price tag of $118 million and will cover almost 400,000 square feet. The facility will consolidate students from three local schools—Gould Elementary School, Mercer Middle School and Groves High School—underneath one roof, and it is scheduled to open in August 2023. The school is being built on the former site of Groves High School.

The campus will include amenities like a digital media lab; CTAE labs for aviation and logistics as well as business and family consumer sciences; a football stadium; a track-and-field area; soccer fields and tennis courts; a baseball field and softball field; two indoor gyms; and a 750-seat, two-story auditorium featuring a full-size performance stage. The campus will feature three paved parking lots with a capacity for 660 cars. Construction also includes the installation of a new traffic signal and the campus’ entrance for more controlled traffic flow.

The facility will have a capacity for 2,400 students. It is being funded through Education Special Purpose Local Sales Tax III dollars. The district is partnering with Charles Perry Partners, Inc., for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition