Riot Glass, Inc., Names New Vice President of Operations

Retrofit security glass and door systems solutions company Riot Glass, Inc., recently named its new Vice President of Operations. A press release announced the appointment of Ron Nyce to the position, stating that he will be “focused on driving operational transformation, growth and scalability for Riot Glass.”

Ron Nyce

Nyce previously served as the Vice President of Operations and Customer Experience for the Consumer Sciences division with Transdev North America, the largest operator of multi-modes of transit operations in the U.S. private sector. And before his move to Transdev in 2018, Nyce worked as a Director with Sears Home Services.

At Sears, according to the press release, he led transformational growth in franchised and managed service provider network operations, information technology refresh initiatives, and business process improvement.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.