Toronto Junior Middle School Installs New Acoustic Panels

Islington Junior Middle School in Toronto, Ontario, Canada, which serves students in grades PreK–8, recently announced that it has installed new acoustic ceiling and wall tiles in four of its classrooms. The school opted for SONEX Valueline panels from pinta acoustic, inc., as a solution to help establish quieter classrooms as a means of boosting performance and reducing stress.

Previously, according to a news release, Islington JMS had been using fabric-wrapped fiberglass panels installed on walls and ceilings to dampen sound. Many of the panels were starting to come loose and fall from the ceiling. In the name of safety, the school’s administration removed the panels and began hunting for alternatives.

Rakesh Rana, interior sales manager for Sound Solutions, Inc., recommended the SONEX Valueline panels to the school. According to a press release, the SONEX panels are lightweight, flexible and are easy to attach to walls and ceilings using a specially designed adhesive.

“We have been working with the Toronto District School Board for over 50 years,” said Rana. “They wanted to mimic the original design in appearance. Offered in custom sizes and colors, SONEX Valueline panels were the best choice. Additionally, SONEX provides better sound absorption than the previous panels.”

The school saw a total of 5,664 square feet of new panels installed. The panels are 1-7/8” thick. Each classroom has 144 SONEX Valueline panels on the ceiling, each of them 24”x48” and installed with pinta’s acouSTIC adhesive to match the contours of the curved ceiling. Likewise, each classroom saw the installation of 30 more 48”x96” panels to cover the walls, again using the adhesive.

“The previous, fabric-wrapped fiberglass panels had to be split on the back before installation to follow the contour of the ceilings,” said Rana. “They were mechanically fastened to the walls and ceilings using clips attached to rails. SONEX panels were much easier to install in this application. A team of people from the school board installed the panels to walls and ceilings in all four classrooms.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • abstract representation of hybrid learning environment

    The Permanence of Change: Why Hybrid Is the New Baseline

    Hybrid learning is here to stay, and it's reshaping how campus spaces function.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition