Toronto Junior Middle School Installs New Acoustic Panels

Islington Junior Middle School in Toronto, Ontario, Canada, which serves students in grades PreK–8, recently announced that it has installed new acoustic ceiling and wall tiles in four of its classrooms. The school opted for SONEX Valueline panels from pinta acoustic, inc., as a solution to help establish quieter classrooms as a means of boosting performance and reducing stress.

Previously, according to a news release, Islington JMS had been using fabric-wrapped fiberglass panels installed on walls and ceilings to dampen sound. Many of the panels were starting to come loose and fall from the ceiling. In the name of safety, the school’s administration removed the panels and began hunting for alternatives.

Rakesh Rana, interior sales manager for Sound Solutions, Inc., recommended the SONEX Valueline panels to the school. According to a press release, the SONEX panels are lightweight, flexible and are easy to attach to walls and ceilings using a specially designed adhesive.

“We have been working with the Toronto District School Board for over 50 years,” said Rana. “They wanted to mimic the original design in appearance. Offered in custom sizes and colors, SONEX Valueline panels were the best choice. Additionally, SONEX provides better sound absorption than the previous panels.”

The school saw a total of 5,664 square feet of new panels installed. The panels are 1-7/8” thick. Each classroom has 144 SONEX Valueline panels on the ceiling, each of them 24”x48” and installed with pinta’s acouSTIC adhesive to match the contours of the curved ceiling. Likewise, each classroom saw the installation of 30 more 48”x96” panels to cover the walls, again using the adhesive.

“The previous, fabric-wrapped fiberglass panels had to be split on the back before installation to follow the contour of the ceilings,” said Rana. “They were mechanically fastened to the walls and ceilings using clips attached to rails. SONEX panels were much easier to install in this application. A team of people from the school board installed the panels to walls and ceilings in all four classrooms.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Announces Winners of 2025 Product Awards

    Spaces4Learning has just announced the winners of the 2025 Product Awards! The award program recognizes innovation and excellence in products that enhance learning environments in K–12 schools and institutions of higher education.

  • Missouri State University Debuts Construction Education Center

    Missouri State University in Springfield, Mo., recently opened a new 10,000-square-foot addition and renovation to support the School of Construction, Design, and Project Management, according to university news. The Construction Education Success Center, built onto the existing Kemper Hall, provides academic space for the school’s construction managers and cost $9.6 million.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

Digital Edition