Toronto Junior Middle School Installs New Acoustic Panels

Islington Junior Middle School in Toronto, Ontario, Canada, which serves students in grades PreK–8, recently announced that it has installed new acoustic ceiling and wall tiles in four of its classrooms. The school opted for SONEX Valueline panels from pinta acoustic, inc., as a solution to help establish quieter classrooms as a means of boosting performance and reducing stress.

Previously, according to a news release, Islington JMS had been using fabric-wrapped fiberglass panels installed on walls and ceilings to dampen sound. Many of the panels were starting to come loose and fall from the ceiling. In the name of safety, the school’s administration removed the panels and began hunting for alternatives.

Rakesh Rana, interior sales manager for Sound Solutions, Inc., recommended the SONEX Valueline panels to the school. According to a press release, the SONEX panels are lightweight, flexible and are easy to attach to walls and ceilings using a specially designed adhesive.

“We have been working with the Toronto District School Board for over 50 years,” said Rana. “They wanted to mimic the original design in appearance. Offered in custom sizes and colors, SONEX Valueline panels were the best choice. Additionally, SONEX provides better sound absorption than the previous panels.”

The school saw a total of 5,664 square feet of new panels installed. The panels are 1-7/8” thick. Each classroom has 144 SONEX Valueline panels on the ceiling, each of them 24”x48” and installed with pinta’s acouSTIC adhesive to match the contours of the curved ceiling. Likewise, each classroom saw the installation of 30 more 48”x96” panels to cover the walls, again using the adhesive.

“The previous, fabric-wrapped fiberglass panels had to be split on the back before installation to follow the contour of the ceilings,” said Rana. “They were mechanically fastened to the walls and ceilings using clips attached to rails. SONEX panels were much easier to install in this application. A team of people from the school board installed the panels to walls and ceilings in all four classrooms.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.