Sharp NEC Display Solutions Debuts New Installation Projector

Projector and display solutions company Sharp NEC Display Solutions recently announced the introduction of a new professional installation projector, the PX2201UL. According to a news release, the projector offers a larger screen and brighter images than previous models. It’s designed for use in a wide variety of settings including corporate, higher education, museums, theaters, arenas and more.

Features include motorized optional lenses; horizontal and vertical lens shift; and built-in blending, stacking and geometric correction. It supports 360-degree, roll-free applications, as well as flexible options for placement. It produces 21,500 lumens of light and WUXGA native resolution. Its RB laser light source is capable of a more expansive color palette than previous projectors, and it includes connectivity inputs from sources like HDBaseT, HDMI, DisplayPort, 5BNC and DVI-D.

“The size of this projector—paired with its ability to produce brighter, more brilliant images—allows users to move it more freely within the marketplace,” said Richard McPherson, Sharp NEC Display Solutions’ Senior Product Manager. “In this case, higher brightness doesn’t mean a heavier unit and more power. The PX2201UL consumes up to 11 percent less power than its predecessor and saves investors on their bottom line.”

More information is available on the Sharp NEC Display Solutions website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.