Florida High School Renovates Performing Arts Center

Construction recently began on a series of renovations and expansions to the Visual Performing Arts (VPA) Center at Booker High School in Sarasota, Fla. The school partnered with SchenkelShultz Architecture to enhance both the aesthetic and technical qualities of the space. The project is scheduled for completion by the end of 2022, according to a news release.

Booker High School Visual Performing Arts Center rendering

“The theater at Booker High School is rich in history and is one of the premier art and cultural ‘gems’ of the Sarasota community,” said SchenkelShultz partner Ken Dean. Renovations include expanding the public lobby for use as a pre-show gathering area and student art gallery; a new balcony and tiered orchestra level for the theater; enhancements to comfort, sightline, and acoustics from the audience; and an expansion that makes room for a black box theater, costume shop, green room and academic space.

“The design preserves the existing theater as a historically significant place to educate students and provides an artistic destination for performers, students, and the community,” said Ekta Desai, AIA, Partner and Design Lead at SchenkelShultz. “Simultaneously, we have elevated the space's production, technology, acoustics, and function, creating an environment that reflects the school's longstanding reputation for excellence.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Bradley Company Highlights Hygiene Tips for Global Handwashing Day

    In honor of Global Handwashing Day on October 15, commercial washrooms and emergency safety solutions provider Bradley Company recently released the results of its 2026 Healthy Handwashing Survey. The findings indicate simple, practical steps that facilities managers can take to encourage good hygiene on campus.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.