Luxxbox Upgrades Linea Slimline Acoustic LED System

Luxxbox, which provides acoustic and flexible workspace solutions, recently announced significant upgrades to its slimline acoustic LED system. The Linea lighting fixture features noise absorption capabilities and acoustic performance. The new model features a plug-and-play power connector that allows canopies and power to be installed before the fixture, requiring only one power feed per run of lights, according to a news release. It also features a cassette-style drive to accommodate factory-programmable drivers after installation.

“The improvements made to the Linea installation process is an industry gamechanger,” said Jason Bird, Founder and Creative Director of Luxxbox. “Unique from other acoustic lighting fixtures on the market, the process is completely simplified with only one power feed needed per run.”

Linea Slimline Acoustic LED System
Photo courtesy of Luxxbox

The Linea fixture debuted in April 2019 and is intended to maximize noise cancellation and acoustic surface areas. The dimmable LED fixtures come as a direct or indirect wash and features shielding options like direct louvered, direct diffused, indirect lensed and unlit. It also comes in four height options, multiple lengths and more than 70 colors, according to a news release. Each fixture can be used independently or paired together to form a continuous run of acoustic illumination.

More information is available on the Luxxbox website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.