MSU Breaks Ground on Student Activities Center

Michigan State University in Lansing, Mich., recently broke ground on a new student activities center. The 10,000-square-foot facility comes with an estimated cost of $4 million and will serve as a space for registered student organizations within the university’s College of Engineering, according to a news release.

Once complete, the new William A. Demmer Engineering Center will contain amenities like an open shop area with minimal walls and barriers to allow for flexibility; a conference space for collaboration among students, faculty and visiting professionals; and a design center with computers, plotters and 3-D printers.

Other features include a testing area for conducting and testing performance analysis, tolerances and vehicle aerodynamics; a machine shop and a fabrication area; a finishing room for painting and other finishing processes; and a manager’s office.

The one-story building is being built adjacent to the MSU Scene Shop teaching lab on the south side of campus. A news release reports that the facility will not be easily accessible to students without cars but will be a stop on the local bus line.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.