Maine High School Starts Construction on $4.3M Athletic Complex

Kennebunk High School in Kennebunk, Maine, recently began work on a new $4.3-million athletic complex. Local news reports that voters approved a portion of the funding for the new project in May and approved the district’s overall operating budget in June. RSU 21 School Board Chair Art LeBlanc called the project “very exciting and long overdue,” as the existing athletic complex has fallen into disrepair in recent years.

During a presentation earlier this year, LeBlanc outlined some of the problems with the current facilities. The track was built in 2004 and is cracked and filled with holes. The bleachers were built in 2006, are not structurally sound and are not ADA-compliant. The 1980s-era lights are outdated, and poles have been damaged by wildlife. Finally, the field has drainage issues and is currently unusable for competition.

According to local news, the new complex will feature synthetic turf to support the school’s football, soccer, lacrosse and field-hockey teams. The turf is made of virgin EPDM material and is free of PSA toxins, as well as the contaminants usually associated with recycled rubber.

New home-side bleachers will cost $258,000, while another portable set will cost $170,000. A new press box will cost $212,000, the new lighting system $368,000, and track upgrades $125,000. Funding for the project is coming from $2.8 million from the district’s capital reserve fund, as well as $1.2 million left over from a previous construction project and another $250,000 previously allocated for track repairs.

The district partnered with CHA Consulting, Inc. to design and engineer the complex’s renovations in participation with local firms Sebago Technics and S.W. Cole. Further details about the project are available on the Maine Regional School Unit 21 website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Boosting Student Wellness and Safety Through Indoor-Outdoor School Spaces

    Engaging students through facilities designed for indoor and outdoor learning and activities reflects a growing awareness of how children learn and thrive, with educators recognizing the importance of getting outside and disconnecting from technology. And, as today’s youth grapple with the urgent mental health crisis of increased anxiety and loneliness fueled by both the pandemic and technology, along with a related crisis in youth physical health, the wellness benefits of getting outside have never been so palpable.

  • Texas A&M Adds ALPR Technology to Parking Solutions

    Texas A&M University in College Station, Texas, recently integrated automatic license plate recognition (ALPR) technology into its parking services and enforcement strategies, according to a news release. The university’s Transportation Services division deployed Genetec AutoVu ALPR to manage the campus’ 36,000+ parking spaces.

  • Abstract colorful arrows in front of a contemporary university building

    Spaces4Learning 2025 Trends in Higher Education

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in higher education from the experts in the trenches.

  • zSpace Imagine Learning Solution

    zSpace Introduces Headset-Free AR/VR System

    Immersive learning company zSpace has debuted the zSpace Imagine Learning Solution, a headset-free AR/VR laptop system designed for elementary education. The all-in-one platform integrates hardware, software, and hands-on lessons to create dynamic learning experiences for young students.