Saddleback College Opens New STEM Facility

Saddleback College in Mission Viejo, Calif., recently opened a new STEM facility on its campus. The Advanced Technology and Applied Sciences (ATAS) building measures in at 52,913 square feet and provides multidisciplinary space for labs and classrooms, general instructional areas, and administrative space. The building will serve career technical education students in subjects like architecture and drafting, environmental sciences, communications, horticulture and more.

The college partnered on the project with construction firm McCarthy Building Companies, Inc. and architecture and design firm HED.

“We’re ecstatic to open this new facility for our students, faculty, staff and broader Orange County community,” said Ann-Marie Gabel, Vice Chancellor, Business Services, for the South Orange County Community College District. “It’s a beautiful space, designed to promote student-to-student collaboration and a sense of openness as the facility blends into the gorgeous Southern California landscape. Students can enjoy the local habitat and feel more connected to nature with onsite butterfly gardens, bird and wildlife areas.”

A news release notes that the ATAS building has achieved a LEED Gold rating equivalency with passive design strategies intended to minimize energy use. The main part of the building connects directly with campus sidewalks. Students enter through one of two entrances into a central collaboration space that opens into a courtyard. Two wings containing classrooms and lab space flank the courtyard, while landscape areas serve as outdoor learning gardens.

“The ATAS project enabled us to integrate the campus, with its highly beautiful natural surroundings, while exceeding the SOCCCD’s goals for the space,” said Martha Ball, Principal at HED. “The design considerations employed were a celebration of the natural habitat, which surrounds the Saddleback College campus. With energy efficiency in mind, the ATAS facility effectively harvests daylight to reduce the need for electrical lighting and derives 35 percent of its energy from solar panels. This, combined with an efficient wall-to-window ratio, are the main strategies to achieve energy savings. Additionally, the concrete structure provides thermal mass to absorb heat with nightly release, and longevity through a robust structure.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.