Construction Firm Completes Two Projects for Manhattan Private Schools

A recent news release reports that construction firm EW Howell Construction Group has completed expansion and renovation projects at two private K–8 schools in Manhattan, N.Y. EW Howell served as the general contractor for a new, 30,000-square-foot facility for Harlem Academy and as the construction manager for expansions to Village Community School.

Harlem Academy interior
Harlem Academy interior
Photos courtesy of Den 25 Creative Studio

The new facility for Harlem Academy covers 30,000 square feet, stands five stories and will be the school’s first permanent home; the school previously rented space along three storefronts. The new space will allow the school to double its enrollment capacity to about 240, including separate spaces for kindergarteners and students in grades 6–8. Amenities include an open entry / commons area, a café, outdoor play space and a new library.

“Harlem Academy was a unique project because of the size of the project site, which allowed for a brand-new building and a ground-level play yard, a rare opportunity we don’t often see for private schools in Manhattan,” said EW Howell Vice President Dominic Paparo. “Due to space constraints, a usual project in this market would consist of the renovation of an existing school building or an adaptive re-use of an existing property into a school building.”

Village Community School exterior
Village Community School exterior

Renovations to the Village Community School, meanwhile, include a 30,000-square-foot, five-level expansion that required deep-site excavation to place a gymnasium in the basement. Other amenities include a new library, classrooms, a rooftop play area and special-skills classrooms. The school and EW Howell collaborated with Marvel Architects on the project, which also includes a curtain wall connecting the existing structure to the new addition to create the feel of a “showcase entrance,” according to the news release.

“It was a unique situation that we could utilize Village Community School’s existing ground-level play yard, which sat adjacent to the existing school building, as the site for the new expansion,” said Paparo. “While each project presented challenges, the result is two amazing new spaces with many opportunities for students and faculty.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • East Carolina University Selects Architect for $60M Residence Hall Renovations

    East Carolina University in Greenville, N.C., recently announced that it has selected the KWK/Jenkins Peer Architects (JPA) team, collaborating with INTREPID Architecture, to design renovations for two of its residence halls, according to a news release.

  • Fort Collins to Convert 1980s Office Park into Junior High School

    The Liberty Common School, a charter-public school in Fort Collins, Colo., recently broke ground on an adaptive reuse project that will convert an 1980s-era office park into a 45,000-square-foot junior high school for seventh- and eighth-grade students, according to a news release.

  • MiraCosta College Completes $42.5M Chemistry, Biotechnology Building

    MiraCosta College in Oceanside, Calif., recently finished construction on a new, $42.5-million Chemistry and Biotechnology Building, according to a news release. The university partnered with builder C.W. Driver Companies and HED Architects on the 20,630-square-foot facility, which will serve the school’s expanding STEM programs.