STEAM Center Construction at University of St. Thomas Underway

At the University of St. Thomas in St. Paul, Minn., construction is underway on a new centralized home for STEAM education. The Schoenecker Center will stand five stories and cover more than 130,000 square feet to integrate the school’s art, science, engineering and innovation programs, according to the university website. Design-build contractor McGough broke ground on the project in May, and construction is scheduled for completion during the spring semester of 2024.

The new facility will include amenities like a high bay for engineering, an emerging media newsroom and classrooms, science labs and offices, an art gallery, rehearsal and performance space for choral and instrumental groups, flex space for collaboration and group work, and a café with a community area.

The $110-million complex was named in honor of donors Guy and Barbara Schoenecker and aims to offer an inclusive approach to interdisciplinary education, according to a university news release. “This building is actually not about contradictions, but an ideal,” said Dean Don Weinkauf of the School of Engineering. “Forward-thinking students thrive at St. Thomas because they come with something more. They come with what I would call an ‘and’ spirit. Great at mathematics and athletics. Great at playing music and designing bridges.”

According to a November 2021 news story announcing the project, the building will house three distinct academic areas: Arts, Engineering and Sciences. It will also play home to the university Center for Artificial Intelligence, the Center for Data Science and the Center for Water Justice. It will also provide space to local K–12 schools and community groups for meetings and performances.

“What research is telling us, what our industry partners are telling us, is that they need graduates who have broad knowledge, who are flexible thinkers and who are used to working with different fields and different ideas,” said University President Julie Sullivan. “That’s exactly what you will see when you step through the doors of the Schoenecker Center.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Amazon Expands Lockers to More Than 500 College, University Campuses

    Amazon recently announced that its Locker Network now totals more than 750 locations at more than 500 college and university campuses around the United States, according to a company news release.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.